Phase 27 — Close Out Sprint 3 Loose Ends

Version: 1.0 Date: 2026-09-23 Status: Complete. TFP-078/079 955601e, TFP-080 abb94f0, TFP-082 6f90a0e (all 2026-09-23). TFP-081’s three pieces landed separately: the help panel in 8be5dd7, the README update in e231a8b, and .clinerules is in .gitignore. Reconciled with git 2026-09-29.

Context

Sprint 3 (Phase 24, TFP-065-070) landed and was verified ticket-by-ticket against the actual repo, not just the report — all four remaining commits (a95027a, 2bd1b32, f54e9e1, 3f3e7ac) check out. Re-running the project’s own npm run lint as part of that verification surfaced 15 pre-existing errors that none of those four commits introduced (confirmed: none of the flagged files appear in any of the four diffs), plus a handful of other loose ends accumulated across the last few sessions. Emil’s call: resolve all of it before picking the next roadmap item, rather than carrying it forward.

Nothing here is new functionality — this phase is entirely cleanup, config correction, and finishing verification that was legitimately deferred (not skipped) in Sprint 3.

Backlog

TFP-078 - Scope no-require-imports correctly: exclude skills/ from the app’s eslint config

TFP-079 - Split actionable-elements.ts along its existing function boundaries

TFP-080 - Document, don’t split, dom-snapshot.ts’s max-lines exception

TFP-081 - Commit the outstanding uncommitted work sitting in the tree

TFP-082 - Restore the local dev server and complete the live-browser verification Sprint 3 deferred

  1. TFP-078 (quick, unblocks a clean lint baseline)
  2. TFP-082 (the dev server fix may be needed for other verification work anyway — worth doing early rather than last)
  3. TFP-079 and TFP-080 (independent of each other and of the above)
  4. TFP-081 (last, so it doesn’t bundle in changes from 078-080)

Suggested Milestone Gates

Gate A - Sprint 3 genuinely closed, nothing carried forward