Last reviewed 2026-10-27, against main at 6bd7fc0. Every file in
docs/decisions/, grouped by phase. Status is the phase’s state as the
roadmap and the record agree on it; where they disagree, the note says so
and the record’s own status line needs correcting.
product-roadmap.md.deferred-work-register.md.../WORKING_AGREEMENTS.md.Kinds: DR decision record (locks scope before building) · BL backlog (tickets) · MR measurement or gate report · REF reference or research, nothing locked.
| Phase | Topic | Status | Documents |
|---|---|---|---|
| 16 | Local-first: delete the FastAPI backend and proxy, Chromium only, decompose the large files | Complete (2026-08-28 to 09-17) | DR phase-16-local-first-decision-record.md · BL phase-16-implementation-backlog.md |
| 17 | Run persistence and honest coverage | Complete (2026-09-22) | DR phase-17-run-persistence-decision-record.md · BL phase-17-walkthrough-backlog.md, phase-17-skills-extraction-backlog.md |
| 18 | Integration mapping and failure injection | Complete (2026-09-23) | DR phase-18-integration-mapping-decision-record.md · BL phase-18-skills-taxonomy-backlog.md |
| 19 | Path and journey mapping | Complete (2026-09-24) | DR phase-19-path-journey-mapping-decision-record.md · BL phase-19-dogfooding-backlog.md |
| 20 | Authenticated testing | Complete (2026-09-24) | DR phase-20-authenticated-testing-decision-record.md · BL phase-20-remaining-skills-backlog.md |
| 21 | AI-assisted generation, measured against the template | Complete; retargeted at the local model | DR phase-21-ai-assisted-generation-decision-record.md · MR phase-21-comparison-report.md · BL phase-21-skill-discovery-backlog.md |
| 22 | Spike: introspect and crawl vs. Playwright MCP | Spike run | BL phase-22-introspect-crawl-spike-backlog.md |
| 23 | Trial: release and rollback skills on test-assist | Trial complete | BL phase-23-release-rollback-trial-backlog.md |
| 24 | Reliability audit | Complete (2026-09-23) | BL phase-24-reliability-audit-backlog.md |
| 25 | Dogfooding against cah-pwa | Complete (2026-09-23) | BL phase-25-cah-pwa-dogfooding-backlog.md |
| 26 | In-app help | Complete (2026-09-23) | BL phase-26-in-app-help-backlog.md |
| 27 | Sprint 3 loose ends | Complete (2026-09-23) | BL phase-27-sprint3-loose-ends-backlog.md |
| 28 | Harden the OpenAI path | Parked (2026-10-19); Gate A open | BL phase-28-openai-path-hardening-backlog.md |
| 29 | Skills maintenance: crawl-and-classify-pages drift |
Not started; in the register’s build order | BL phase-29-skills-maintenance-backlog.md |
| 30 | Local (Ollama) generation path | Implemented (2026-09-24) | DR phase-30-local-generation-path-decision-record.md |
| 31 | Local model tuning | Implemented (2026-09-24) | DR phase-31-local-model-tuning-decision-record.md |
| 32 | Local model follow-ups | Implemented (2026-09-24) | DR phase-32-local-model-followups-decision-record.md |
| 33 | Local model category coverage | Implemented (2026-09-24) | DR phase-33-local-model-category-coverage-decision-record.md |
| 34 | Template coverage and additive gap-filling (Option B) | Complete (2026-09-29) | DR phase-34-template-coverage-and-gap-filling-decision-record.md · MR phase-34-option-b-measurement-report.md |
| 35 | Comprehensive testing, first slice (security, accessibility) | First slice built (2026-10-01); later areas in the register | DR phase-35-comprehensive-testing-decision-record.md · MR phase-35-first-slice-measurement-report.md · REF phase-35-security-testing-research.md, phase-35-security-reviewer-questions.md |
| 36 | Trust in results; measuring the local model | Complete (2026-09-30) | DR phase-36-trust-and-local-model-measurement-decision-record.md · MR phase-36-local-model-measurement-report.md · data data/labelled-failures.md |
| 37 | Gap-fill prompt fix; two model gates | Complete (2026-09-30) | DR phase-37-gap-fill-prompt-and-model-gates-decision-record.md |
| 38 | Standard run: three gates, conformance checks, performance bands | Complete (2026-10-06) | DR phase-38-standard-run-gates-and-conformance-decision-record.md · MR phase-38-standard-run-measurement-report.md |
| 39 | Run speed: fewer page visits, then workers | Complete (2026-10-31); Gate D closed | DR phase-39-run-concurrency-decision-record.md · MR phase-39-tfp211-measurement-report.md, phase-39-gate-b-report.md, phase-39-gate-c-report.md |
| 40 | Page-type selection | Complete (2026-10-07) | DR phase-40-page-type-selection-decision-record.md |
| 41 | Check gaps the benchmark missed | Complete (2026-10-13) | DR phase-41-check-gaps-decision-record.md · BL known-bug-benchmark-backlog-2026-10-06.md, real-site-run-findings-backlog-2026-10-01.md, run-evidence-sweep-backlog-2026-10-13.md · MR known-bug-benchmark-report-2026-10-06.md |
| 42 | Reusable suites, a test library, gap tests | Complete (2026-10-15) | DR phase-42-reusable-suites-and-gap-tests-decision-record.md |
| — | Post-Phase 42 review (R1–R6) | Done (2026-10-15 to 10-20) | post-phase-42-review-plan.md · post-phase-42-review-findings.md · post-phase-42-review-notes-2026-10-15.md · r6-skills-relook-2026-10-20.md |
| 43 | Ownership confirmation and the active gate | Locked (2026-10-19), not started | DR phase-43-ownership-confirmation-decision-record.md |
| 44 | Scenario gaps, slice 1 | Locked (2026-10-20), not started | DR phase-44-scenario-gaps-decision-record.md · REF scenario-gap-candidates-2026-10-19.md |
| 45 | Docker sandbox for model-written tests | Locked (2026-10-20), not started | DR phase-45-docker-sandbox-decision-record.md |
| 46 | App screens | Locked (2026-10-20), not started | DR phase-46-app-screens-decision-record.md |
| 47 | Mr Onion in a target’s CI pipeline | Complete (2026-11-13); released as 0.4.0, the image’s first publish (ghcr.io/emil3663/mr-onion:0.4.0, public) |
DR phase-47-ci-integration-decision-record.md · BL workflow-and-ci-backlog-2026-10-26.md Part 1 |
| 48 | The rename to Mr Onion (D39) | Complete (2026-11-12); merged as 2861a4c |
DR phase-48-rename-to-mr-onion-decision-record.md |
| Document | What it is |
|---|---|
deferred-work-register.md |
Every deferred item (D1–D30), its status and the build order |
workflow-and-ci-backlog-2026-10-26.md |
Working-agreement follow-ups, architect-facing docs, CI integration |
dependency-upkeep-2026-11-08.md |
The dependency watch list the monthly check reads; TFP-273 (Dependabot version updates) and TFP-274 (the crawl’s URL scheme allowlist) |
practice-site-targets-2026-10-19.md |
The practice sites Mr Onion should eventually find every issue in |
saas-prerequisites.md |
What a hosted version would need; deferred, not scheduled |
data/ |
Data files the records cite |
Phases 1–15 predate this folder. They were the April 2026 consolidation
from the FastAPI backend to Next.js: 1–12 are kept for history in
../consolidation/; 13–15 (environment config, health and observability,
security headers, all 2026-04-22) exist only as commits (597879a,
01810a4, 437f1aa).